Two new gas power plants
Posted on: Sunday, February 9th, 2020
Israel is to build two power units at Hadera by 2022, to be operated solely with natural gas. The units will supply 1,200 megawatts of power, replacing four coal-fired production units as part of Israel’s plan to eliminate coal usage by 2025 and improve air quality.
https://www.reuters.com/article/us-israel-energy-natgas/israel-to-build-two-natural-gas-power-units-amid-plan-to-end-coal-usage-idUSKBN1Z61CW
This entry was posted in
Science & Technology. Bookmark the
permalink.