Eilat to be energy independent in 2 years

An eight-megawatt medium-sized solar field has been installed at Kibbutz Neot Smadar – the second major solar site in the Eilat area. Within 2 years, new sites will increase local capacity to 160MW, well above the current 120MW consumption level.
http://www.jpost.com/Enviro-Tech/Eilat-Eilot-vows-to-become-energy-independent-within-2-years-332590

This entry was posted in Science & Technology. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *