The 290-meter high production platform for Israel’s Tamar natural gas field is taller than Israel’s tallest skyscraper. The platform has left Texas, after 18 months of construction, and will arrive in Israel on board the largest barge of its kind. Production at the Tamar field is scheduled to begin in March 2013, and will (hopefully) supply natural gas to the Israeli economy for decades.
http://www.globes.co.il/serveen/globes/docview.asp?did=1000787705&fid=1725
“The largest infrastructure project in Israeli history”
This entry was posted in Science & Technology. Bookmark the permalink.